Find Materials
Operator Killed as Boom Touches Power Line
A company was contracted to dig post holes for a fencing project which was located adjacent to overhead power lines. A hydraulic auger with a 30-foot boom was being operated […]
FavoriteA company was contracted to dig post holes for a fencing project which was located adjacent to overhead power lines. A hydraulic auger with a 30-foot boom was being operated […]
Favorite